Case Study 2: Devonshire on the Park

The following is a brief overview of a past building envelope investigation and remediation done by Lee & de Ridder Architects. The client had reported that the complex had potential water intrusion problems. Upon launching a full investigation, Lee & de Ridder architects were able to identify the impact on the integrity of the building envelope and address the problems that were discovered.  

Identification of poor quality workmanship on metal flashing installation.

Identification of white moulds which can rot wood and pose danger to occupants

(Left) Identifying sources of structural damage and water leaks (Right) Temporary structures built due to inadequate structure

Introduction of means to address and remediate structural problems and using new materials for future preventive measures